Subfloor Replacement
Remove and replace damaged sections before finish flooring is installed.
- Localized replacement
- Level preparation
- Moisture-damage scope
Subfloor Preparation • Jacksonville, FL
Get the base ready for a new floor: damaged subfloor decking is replaced and the surface is prepared for tile or LVP. Joists, beams and anything load-bearing are structural work for a structural professional.
Free written estimates · Jacksonville, FL
5.0 · 36 Google reviewsOur subfloor work exists to support the new floor we are installing. Joists, beams, engineering and load-bearing work are not part of our scope.
Overview
Water, movement and age can leave a floor uneven or soft. Before tile or LVP is installed, the subfloor decking is checked and prepared so the new floor goes down on a sound, flat base.
The estimate lists which decking is replaced and what preparation is included. Framing, joist and other structural repairs are not offered by Braga.
Subfloor decking
Damaged sections replaced
Structural items
Referred to a structural pro
Finish preparation
Tile and LVP ready
Scope boundaries
Clearly documented
Signs
A soft spot by the toilet or the tub, tile that cracks again after it is replaced, a floor that bounces or squeaks, or grout that keeps crumbling in one area usually point to a problem underneath. In Jacksonville this applies mostly to second floors and to older houses on raised floors, such as many in Riverside, Avondale, San Marco and historic St. Augustine. Homes built on a concrete slab do not have a wood subfloor on the ground floor.
The cause is often an old leak, such as a failed toilet wax ring or tub drain. The plumbing repair is done by a plumber first; Braga does not do plumbing.
Standards
Tile and plank each have their own requirements. Industry guidelines for tile call for a floor that does not bend too much under load and is flat within tight limits, tighter still for large-format tile and natural stone, which need a stiffer floor than ceramic. Most vinyl plank manufacturers publish their own flatness limit, typically a small fraction of an inch over several feet.
Replacing damaged floor decking and flattening the surface are done so the finish floor meets those limits. Cracked, notched or sagging joists, or anything load-bearing, is structural work: we stop and you bring in a structural professional before we continue.
Materials
Replacement subfloor is usually tongue-and-groove plywood or OSB, glued and screwed to the joists. Under tile, cement backer board or an uncoupling membrane goes on top of the subfloor; under LVP, the plank goes over the flattened subfloor with the underlayment the manufacturer requires. See tile installation and LVP installation.
Repair Services
Remove and replace damaged sections before finish flooring is installed.
Cracked, notched or sagging joists and anything load-bearing are checked and repaired by a structural professional; we replace the decking and finish the floor afterward.
Prepare the base for tile with attention to level, transitions and the planned layout.
Prepare subfloor surfaces for luxury vinyl plank installation and trim.
Our Process
We review the accessible floor area and the finish planned above it.
The estimate separates repair, preparation and finish work.
Approved sections are removed, repaired or replaced.
Tile, LVP or trim work proceeds over the prepared base.
Service Areas
Check your service area
Enter your ZIP to see whether it is on our standard Jacksonville-area service list.
Explore remodeling service areas
FAQ
Google Reviews
5.0 average from 36 reviews on Google
“I had a great experience with this construction company. They were honest, reliable, and did exactly what they promised. The team was professional, hardworking, and paid attention to every detail.”
“We had an overall wonderful experience with Braga Remodeling. They were responsible, professional and communicated well throughout the process.”
“Excellent service and outstanding workmanship! The crew was punctual, respectful, and very knowledgeable throughout the entire project.”
Tell us where the floor feels damaged or uneven and what finish you want afterward. Prefer to talk? Call (904) 520-1994 or email braga@bragaremodeling.com.
Call (904) 520-1994