Overview
Demolition is the first phase of the remodel, not a separate trade
Most of our demolition work is the opening phase of a bathroom remodel or a kitchen remodel that the same crew then rebuilds. That changes how the tear-out is done: tile comes off the shower walls without destroying the framing behind it, cabinets come out without tearing up plumbing that stays, and floors are stripped back to a substrate the new work can actually be built on. When one crew carries a project from demo to finish, nothing gets demolished that the next phase needed.
The scope is spelled out in writing before anything is touched: exactly what comes out, what stays, what gets protected, and where the debris goes. A bathroom demo usually means the tub or shower, tile, vanity, toilet, flooring and the wet-wall surfaces down to sound material. A kitchen demo means cabinets, countertops, backsplash, appliances out of the way and flooring. Around those anchors we also remove drywall, non-structural walls and partitions, ceilings where the scope calls for it, and old flooring of every common type — the full strip-out detail is on our flooring removal page.
Homeowners hire us for stand-alone demolition too: a room that needs to go back to studs before a later project, a floor that has to come out before new flooring, or a wall that needs to open two rooms into one. General contractors and property owners use us the same way — the demo phase of a project, run by a crew that protects the site, controls the dust and leaves the space broom-ready for whoever builds next.